Final | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/25/2007 at 9:26:23 AM. Contact: ###-####.
|
Electrical Rough-In | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/24/2007 at 7:40:07 AM. Contact: ###-####. tie all electrodes together. choke off electrode conductor on both ends of raceways and electrical continuity of metal raceways. install proper color #12 wire to array.
|
Electrical Rough-In | 9/20/2007 | 9/21/2007 | 9/21/2007 | A | NH |
Pat Lass
|
|
|
DAN Phone #: ###-#### no access need contractor on site
|