Final | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | PASS |
Bob Reichert
|
|
|
lynn - please inspect both the east and west gates Phone #: ###-#### ok to final
|
Permanent Service | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PASS |
Jack Frank
|
|
|
lynn Note: Service located at Allumbaugh gate entrance Phone #: ###-#### p/s u/g new ok
|
Electrical Rough-In | 10/22/2007 | 10/22/2007 | 10/22/2007 | P | PASS |
Mike Kinnear
|
|
|
lynn - underground conduits at the new electric gate Phone #: ###-#### ok cover under ground conduit
|
Electrical Rough-In | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/17/2007 at 5:36:47 PM. Contact: ###-####. called, left message, part corrections made, east entrance (Allambaugh) street entry u/g only ok to cover- need to do Mckinney side later
|
Electrical Rough-In | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | FAIL |
Bob Reichert
|
|
|
lynn - underground Phone #: ###-#### called, left corr notice, nec 300.5 rnc u/g conduit shall be 24" under pavement, 352.26 there shall not be over 360 degree bends without pull point provided in rnc, BCC all u/g shall be inspected before cover
|