Final | 10/25/2007 | 10/25/2007 | 10/25/2007 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kathy Smith
|
Conference | 10/24/2007 | 10/24/2007 | 10/25/2007 | P | DONE |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kathy Briggs called contractor to establish grounds at each generator, currently grounded to transfer switch
|
Final | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kathy Briggs see conference
|
Rough-In Permanent Service | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PART |
Pat Lass
|
|
|
Underground cover inspection. Phone #: ###-#### Internet Inspection Request from: Kathy Briggs 3 Pads ok
|