Final | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | PASS |
Jack Frank
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt ok c ard signed
|
Final | 11/1/2007 | 11/1/2007 | 11/1/2007 | P | FAIL |
Jack Frank
|
|
|
Glenn Phone #: ###-#### not power south wall exam rm #7 called see added r/i
|
Electrical Rough-In | 11/1/2007 | 11/1/2007 | 11/1/2007 | P | PASS |
Jack Frank
|
|
|
Glenn Phone #: ###-#### grid ceilings ok
|
Electrical Rough-In | 10/22/2007 | 10/22/2007 | 10/22/2007 | P | PART |
Jack Frank
|
|
|
glen Phone #: ###-#### ok
|
Electrical Rough-In | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PART |
Mike Kinnear
|
|
|
Phone #: ###-#### ok cover one rm walls only anop
|
Electrical Rough-In | 10/18/2007 | 10/18/2007 | 10/18/2007 | P | PASS |
Bob Reichert
|
|
|
GLENN Phone #: ###-#### ok to cover walls only ne and hall part anop, met contractor, will do existing upgrade as access to rooms becomes available
|
Electrical Rough-In | 10/16/2007 | 10/16/2007 | 10/16/2007 | P | FAIL |
Jack Frank
|
|
|
glenn Phone #: ###-#### corr. called BCC 4.5.54 code violations not to be retained, all existing and new patient care areas shall meet requirements of 517.13(A&B)
|