Final | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/21/2008 at 8:19:06 AM. Contact: ###-####. ok to final
|
Permanent Service | 11/20/2007 | 11/21/2007 | 11/21/2007 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/20/2007 at 3:02:22 PM. Contact: ###-####. checked outside and sub panel in east unit called contractor and told him the requirements for final on the service P/S O/H R Ok to transfer power.
|