Final | 1/8/2008 | 1/9/2008 | 1/9/2008 | P | PASS |
Bob Reichert
|
|
|
bill Phone #: ###-#### ok to final
|
Electrical Rough-In | 1/9/2008 | 1/9/2008 | 1/9/2008 | P | PASS |
Bob Reichert
|
|
|
bill Phone #: ###-#### ric ok
|
Final | 1/2/2008 | 1/4/2008 | 1/4/2008 | P | CANC |
Bob Reichert
|
|
|
bill Phone #: ###-#### see conference
|
Conference | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | DONE |
Bob Reichert
|
|
|
bill Phone #: ###-#### met contractor, talked about BCC no violations shall be retained, open up ceilings, no low voltage to be on grid, showroom receptacles, strapping conduit and raceways, etc
|