Final | 2/13/2008 | 2/14/2008 | 2/14/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/13/2008 at 10:14:32 PM. ok final
|
Rough-In Permanent Service | 12/17/2007 | 12/18/2007 | 12/18/2007 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/17/2007 at 9:18:32 PM. Contact: ###-####. . 1. bathroom ri ok. .
|
Conference | 12/9/2007 | 12/11/2007 | 12/11/2007 | P | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/9/2007 at 12:43:10 PM. Contact: ###-####. talked about bath remodel, circuits, when to call for ri, 1 1/4", free length of conductor, make-up, etc
|