Final | 1/23/2008 | 1/24/2008 | 1/24/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/23/2008 at 3:43:00 PM. Contact: ###-####. ok to final, signed occupancy card, called contractor
|
Electrical Rough-In | 12/6/2007 | 12/7/2007 | 12/7/2007 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/6/2007 at 1:34:15 PM. Contact: ###-####. called contr, they are changing address again, u/g ok to cover in slab, told contractor to put cover on meter pak and provide clearance at service- remove tree and shrubs
|
Rough-In Permanent Service | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | CANC |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 11:21:43 AM. Contact: ###-####. . 1. See the other inspections for this date. .
|
Electrical Rough-In | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 11:21:43 AM. Contact: ###-####. . 1. ri is ok. . . 2. The address is not entirely correct, it needs to be suite 100. . . 3. No further inspections will be done until correction is made. .
|
Permanent Service | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 11:21:43 AM. Contact: ###-####. . 1. p/s u/g n ok. . . 2. A meter is all that is needed for this location. .
|