Final | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Bob Reichert
|
|
|
Patrick Phone #: ###-#### corrections made, ok final
|
Final | 5/16/2013 | 5/17/2013 | 5/17/2013 | P | FAIL |
Rock A. Hudson
|
|
|
patrick Phone #: ###-#### 4 breakers installed in panel not listed for panel type. Jetted tub shall be GFCI protected
|
ELE-Aging Inspection | 5/6/2013 | 5/6/2013 | 5/7/2013 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Electrical Rough-In | 2/4/2013 | 2/5/2013 | 2/5/2013 | P | PASS |
Bob Reichert
|
|
|
request btwn 1-4//Patrick Phone #: ###-#### ok cover room behind kitchen, and kitchen wall
|
ELE-Aging Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Request for Extension | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | PASS |
Bob Reichert
|
|
|
Patrick Phone #: ###-#### called, owner will call for inspection by January, final by spring
|
ELE-Aging Inspection | 8/17/2012 | 8/17/2012 | 8/23/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 5/18/2012 | 5/18/2012 | 5/21/2012 | | DONE |
Bob Reichert
|
|
|
called, left message to call about status of work
|
ELE-Aging Inspection | 2/17/2012 | 2/17/2012 | 2/17/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Request for Extension | 11/18/2011 | 11/18/2011 | 11/18/2011 | P | PASS |
Bob Reichert
|
|
|
said he talked to you over the phone ok to extend, construction on-going
|
ELE-Aging Inspection | 9/26/2011 | 9/26/2011 | 9/27/2011 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 6/27/2011 | 6/27/2011 | 6/27/2011 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Electrical Rough-In | 3/28/2011 | 3/28/2011 | 3/28/2011 | P | PASS |
Bob Reichert
|
|
|
Call before arrival, the later the better--Patrick Phone #: ###-#### ok cover office area
|
ELE-Aging Inspection | 1/31/2011 | 1/31/2011 | 1/31/2011 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Electrical Rough-In | 11/30/2010 | 12/1/2010 | 12/1/2010 | A | PASS |
Bob Reichert
|
|
|
Patric-As early as possible please--Please call prior to inspection Phone #: ###-#### corrections made, exterior walls, ok to cover, range ok
|
Electrical Rough-In | 11/29/2010 | 11/29/2010 | 11/30/2010 | P | FAIL |
Jack Frank
|
|
|
Patrick-please call prior to inspection Phone #: ###-#### corr. nail plates and 11/4", countertop out spacing, and remove mud rm wiring from SABC outside boxes shall be flush with siding
|
ELE-Aging Inspection | 2/10/2010 | 2/10/2010 | 2/17/2010 | | CANC |
Jack Frank
|
|
|
|
DOC - Permit Expired | 2/17/2010 | 2/17/2010 | 2/17/2010 | P | PASS |
Jack Frank
|
|
|
|
ELE-Aging Inspection | 12/10/2009 | 12/10/2009 | 12/16/2009 | | DONE |
Bob Reichert
|
|
|
no activity, suc
|
Electrical Rough-In | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PASS |
Mike Kinnear
|
|
|
patrick Phone #: ###-#### ok cover ri basement area only
|
Electrical Rough-In | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | PASS |
Mike Kinnear
|
|
|
patrick Phone #: ###-#### nec shall support nm cable 1 1/4 inch from both sides of vert. framing members
|
Electrical Rough-In | 7/24/2008 | 7/25/2008 | 7/25/2008 | A | CANC |
Bob Reichert
|
|
|
Patrick Phone #: ###-####n see conference, too many corrections for ri
|
Conference | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | DONE |
Bob Reichert
|
|
|
Patrick Phone #: ###-#### too many corrections for ri, talked about no screws inside box, box fill- used 2x4 framing members turned 90 degrees and 8 cubic inch boxes with 3 romex inside, no make-up done, 6' wall spacing by bedroom entry, told to mount boxes for bath sinks,
|
Permanent Service | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | PASS |
Jack Frank
|
|
|
patrick Note:please call 1/2 hr prior to inspection Phone #: ###-#### clamp at rebar ok for cover, feed to sub panel ok needs to grd and bond water system p/s u/g new ok
|
Conference | 3/19/2008 | 3/20/2008 | 3/20/2008 | P | PASS |
Mike Kinnear
|
|
|
patrick ###-#### Phone #: ###-#### ok conf with home owner service
|