Final | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/26/2008 at 3:17:29 PM. Contact: ###-####. ok final
|
Rough-In Permanent Service | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/14/2008 at 9:12:08 AM. Contact: ###-####. p/s u/g n ok ok cover ri corrections made
|
Electrical Rough-In | 2/12/2008 | 2/13/2008 | 2/13/2008 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/12/2008 at 3:18:49 PM. Contact: ###-####. called, left correction notice, NEC 314.16 box fill shall not be exceeded (kitchen), 334.30 shall not staple flat nm cable on edge, 300.4(A) & (D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, 314.20 boxes shall be flush with or project therefrom in walls of combustible material, 210.70(A)(2) shall provide switched lighting outlet at garage entrance
|
Rough-In Permanent Service | 12/6/2007 | 12/7/2007 | 12/7/2007 | A | CANC |
William E Thomas
|
|
|
tom Phone #: ###-#### . 1. no permanent service at this time, see rough-in for this date. .
|
Electrical Rough-In | 12/7/2007 | 12/7/2007 | 12/7/2007 | P | PASS |
William E Thomas
|
|
|
tom Phone #: ###-#### . 1. underground from the house to the garage ok. .
|