Electrical Rough-In | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Pat Lass
|
|
|
eddie Phone #: ###-####
|
DOC - Permit Finaled | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Pat Lass
|
|
|
|
Electrical Rough-In | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PART |
Jack Frank
|
|
|
eddie Phone #: ###-#### beth floor heat ok
|
Electrical Rough-In | 12/24/2007 | 12/24/2007 | 12/24/2007 | P | PASS |
Mike Kinnear
|
|
|
Rough in Master Bed & Bath. Please call Goldy (contractor, with any questions) ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok cover ri
|
Electrical Rough-In | 12/21/2007 | 12/24/2007 | 12/24/2007 | A | NH |
Mike Kinnear
|
|
|
Inspection of Rough In in master bedroom and bath. Please call Eddy with any questions. Phone #: ###-#### Internet Inspection Request from: Beka Hereau no access reinspection fee called left message
|