Permanent Service | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | CANC |
Bob Reichert
|
|
|
james Phone #: ###-#### gave ok yesterday, see final
|
Final | 12/28/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Bob Reichert
|
|
|
james Phone #: ###-#### called contractor to finish circuit schedule, ok to final
|
Permanent Service | 12/27/2007 | 12/27/2007 | 12/27/2007 | P | PASS |
Bob Reichert
|
|
|
james Phone #: ###-#### met contractor, told them that they need to call for am inspection, they assuming ok for power to reconnect before full inspection. contractor did not start work until after 12:30 pm. p/s o/h rec ok
|