Final | 5/1/2008 | 5/1/2008 | 5/1/2008 | A | PASS |
William E Thomas
|
|
|
robert Note:please call 1/2 hr prior to inspection to meet with . .1. final ok. . .
|
Final | 4/30/2008 | 4/30/2008 | 4/30/2008 | P | FAIL |
Mike Kinnear
|
|
|
robert - please call for access Phone #: ###-#### t/w rob life safety issues open wiring in kitchen (lights above sink), boc on the right side of sink needs check for boxfill, & outlet in hallway by bathrm exposed wiring these corrections were not done on his scope of work.
|
Final | 4/29/2008 | 4/30/2008 | 4/30/2008 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/29/2008 at 5:45:27 PM. Contact: ###-####. t/w rob job not ready
|
Electrical Rough-In | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Mike Kinnear
|
|
|
robert Phone #: ###-#### Note: please call 1/2 hr prior to inspection ok cover ri
|
Electrical Rough-In | 2/12/2008 | 2/13/2008 | 2/13/2008 | A | NR |
Mike Kinnear
|
|
|
robert Phone #: ###-#### conf with electrical contractor
|