Final | 7/16/2008 | 7/17/2008 | 7/17/2008 | A | PASS |
Pat Lass
|
|
|
Chris if the contact his cell number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates no card to sign
|
Electrical Rough-In | 6/27/2008 | 6/30/2008 | 6/30/2008 | A | PASS |
William E Thomas
|
|
|
Ceiling inspection. Chris is the onsite contact his number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates . .1. remainder 1st floor ok to cover drop cieling. . .
|
Permanent Service | 5/15/2008 | 5/16/2008 | 5/16/2008 | A | PASS |
Pat Lass
|
|
|
Chris is the onsite contact his number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates P/S U/G N Ok
|
Electrical Rough-In | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | PART |
Pat Lass
|
|
|
This is a ceiling inspection. Chris is the onsite contact, his # is ###-####.. Phone #: ###-#### Internet Inspection Request from: Shawna Gates hard lids ok
|
Electrical Rough-In | 4/29/2008 | 4/29/2008 | 4/29/2008 | P | PART |
Pat Lass
|
|
|
Ceiling inspection. Chris is the contact electrician his # is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates restrooms hard lids ok
|
Conference | 4/23/2008 | 4/25/2008 | 4/25/2008 | A | PART |
Pat Lass
|
|
|
dan - 10:00 Phone #: ###-#### discussed dedicated space about switch gear.
|
Permanent Service | 4/11/2008 | 4/14/2008 | 4/14/2008 | A | FAIL |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shawna Gates . .1. does not provide for the working space clearance that is needed. . . . .2. this clearance needs to be both the front and sides. . .
|
Electrical Rough-In | 3/13/2008 | 3/14/2008 | 3/14/2008 | P | PART |
Pat Lass
|
|
|
Chris is the contact electrician his number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls ok
|
Conference | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | PART |
Pat Lass
|
|
|
Please call Mike 30 Min. prior to conference at ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Heather Packer service disconnects are required to be grouped
|