Final | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
William E Thomas
|
|
|
please call duke if needed for final. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey . .1. final ok. . .
|
Electrical Rough-In | 3/24/2008 | 3/25/2008 | 3/25/2008 | P | PASS |
Bob Reichert
|
|
|
please call Duke if needed for above ceiling inspection on 2nd floor. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey large office and conference room ceilings ok to cover
|
Electrical Rough-In | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | PART |
Bob Reichert
|
|
|
Please call Duke if needed for this TI directly above PF Changs on 2nd floor of BoDo building.Omit the conference room as it does not yet have acoustic ceiling installed for can light installation. Thank you Phone #: ###-#### Internet Inspection Request from: Loren Ramsey ceilings ok to cover except large office and conference rooms
|
Permanent Service | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PASS |
Bob Reichert
|
|
|
Zack, Suite #260; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt p/s, exst meter pak, n, ok, 1 meter
|
Electrical Rough-In | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | PASS |
Bob Reichert
|
|
|
mike - as early as possible please Phone #: ###-#### hard lids only ok to cover
|
Electrical Rough-In | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | PASS |
Bob Reichert
|
|
|
call Mike if needed for rough in inspection. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey changes, (low voltage) ok to cover
|
Electrical Rough-In | 1/29/2008 | 1/30/2008 | 1/30/2008 | A | PASS |
Bob Reichert
|
|
|
Please call Mike if needed for walls only rough in inspection. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey walls only anop ok to cover
|