Final | 3/18/2008 | 3/19/2008 | 3/19/2008 | P | PASS |
Mike Kinnear
|
|
|
call Duke if neccasary for a final inspection at the Pain Center TI on the first floor. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey ok final note signed card
|
Electrical Rough-In | 3/4/2008 | 3/5/2008 | 3/5/2008 | P | PASS |
Mike Kinnear
|
|
|
Please call Duke if needed for this above cieling rough in inspection on the first floor TI. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey ok cover ceiling only
|
Electrical Rough-In | 2/7/2008 | 2/8/2008 | 2/8/2008 | P | PART |
Jack Frank
|
|
|
Please call Duke if necassary for walls only rough in inspection. Thanks Phone #: ###-#### Internet Inspection Request from: Loren Ramsey walls and rest rm hard lid ok
|