Final | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
Pat Lass
|
|
|
gary Phone #: ###-####
|
Final | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PART |
Pat Lass
|
|
|
gary - switch gear Phone #: ###-#### switch gear ok had conf about furnishing listing and panic buttons at doors in IT room
|
Electrical Rough-In | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Pat Lass
|
|
|
gary Phone #: ###-#### ceilings ok to cover had conf about switch gear and trans. requested fault current calculation to main breaker
|
Electrical Rough-In | 2/6/2008 | 2/6/2008 | 2/6/2008 | P | PART |
Jack Frank
|
|
|
gary - Note: ceiling Phone #: ###-#### hard ceilings rms 107,8,12 ok
|
Electrical Rough-In | 2/4/2008 | 2/5/2008 | 2/5/2008 | A | PART |
Pat Lass
|
|
|
Please call Gary Lee with any questions. Phone #: ###-#### x0000 Internet Inspection Request from: Sandee Johnson wallsok
|
Electrical Rough-In | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Bob Reichert
|
|
|
Please call Gary Lee with any questions. Phone #: ###-#### x0000 Internet Inspection Request from: Sandee Johnson see conference
|
Conference | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | DONE |
Bob Reichert
|
|
|
Please call Gary Lee with any questions. Phone #: ###-#### x0000 Internet Inspection Request from: Sandee Johnson met 2 apprentices returning from lunch, they showed the areas of job until journeyman arrived. Talked about 1 1/4" which they need considerable amount of nailplates, some mc cables need 1 1/4" on studs, randomly opened some prebuilt receptacles, told them they must have 6" free conductor length in boxes, told them ok to 1 side for sheet rock for tomorrow morning, but be sure to call for inspection in am for walls
|