Final | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/4/2008 at 2:51:36 PM. Contact: ###-####. ok final note no card avaible to sign
|
Electrical Rough-In | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/28/2008 at 8:06:01 AM. Contact: ###-####. ok cover ceiling only
|
Electrical Rough-In | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/15/2008 at 4:39:57 PM. Contact: ###-####. conf. nec400.8 (bug zappers) & no cable shall be supported by the ceiling grid
|
Electrical Rough-In | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/8/2008 at 12:17:22 PM. Contact: ###-####. ok cover walls only 4th floor
|