Final | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Pat Lass
|
|
|
12th floor Phone #: ###-#### Internet Inspection Request from: Curtis Dunham
|
Final | 3/26/2008 | 3/27/2008 | 3/26/2008 | A | CANC |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Curtis Dunham Inspection cancelled from web by: Curtis Dunham
|
Electrical Rough-In | 3/18/2008 | 3/19/2008 | 3/20/2008 | P | PASS |
William E Thomas
|
|
|
Above Ceiling inspection second number ###-#### 12th Floor Phone #: ###-#### Internet Inspection Request from: Curtis Dunham . .1. cieling in lobby area ok. .
|
Electrical Rough-In | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | FAIL |
Pat Lass
|
|
|
second number ###-#### -- THIS IS WORK IS ON THE 12TH FLOOR -- this may be more of a conference we need to know what is going to be required for the existing electrical above the ceiling so we can get a correction notice and proceed with the change order process if needed for project to be approved. thank you Curtis Phone #: ###-#### Internet Inspection Request from: Curtis Dunham gave correction for no violations retained
|
Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 | A | PART |
Pat Lass
|
|
|
inspection of ceiling and walls 2nd number Curtis ###-#### Phone #: ###-#### Internet Inspection Request from: Curtis Dunham hard lids ok
|
Electrical Rough-In | 2/19/2008 | 2/19/2008 | 2/19/2008 | P | PART |
Pat Lass
|
|
|
first #is Shane 2nd is Curtis ###-#### inspection for cover of elevator lobby and a small connecting area. Also some columns and new walls. Shane should be on site. Thank you Phone #: ###-#### Internet Inspection Request from: Curtis Dunham Walls ok
|