Final | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 7:13:17 AM. Contact: ###-####. ok no card
|
Rough-In Permanent Service | 5/23/2008 | 5/23/2008 | 5/23/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/23/2008 at 6:37:14 AM. Contact: ###-####. r/i ok
|
Electrical Rough-In | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 4/2/2008 at 9:37:26 AM. Contact: ###-####. soffet lights ok
|