Final | 10/23/2008 | 10/27/2008 | 10/27/2008 | A | PASS |
Jack Frank
|
|
|
ryan Phone #: ###-#### ok card signed
|
Electrical Rough-In | 9/30/2008 | 9/30/2008 | 9/30/2008 | A | PART |
Jack Frank
|
|
|
Ceiling inspection Phone #: ###-#### Internet Inspection Request from: Brandon Blackham ok
|
ELE-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | | DONE |
Jack Frank
|
|
|
|
Electrical Rough-In | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PART |
Jack Frank
|
|
|
wsuc
|
Electrical Rough-In | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PART |
Jack Frank
|
|
|
Soffit inspection Phone #: ###-#### Internet Inspection Request from: Brandon Blackham ok
|
Electrical Rough-In | 6/27/2008 | 6/27/2008 | 6/27/2008 | P | PASS |
Jack Frank
|
|
|
jeremy - basement Phone #: ###-#### all floors all walls ok
|
Electrical Rough-In | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | FAIL |
Jack Frank
|
|
|
Basement inspection Phone #: ###-#### Internet Inspection Request from: Brandon Blackham called left mesage, 300.4 needs nail plates , 11/4" for ENT also bushings for all ENT, shall not use tywraps for ENT
|
Rough-In Permanent Service | 6/17/2008 | 6/18/2008 | 6/18/2008 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brandon Blackham r/i for 1st floor walls and ceilings still needs r/i for grid ceiling, p/s u/g new ok
|
ELE-Aging Inspection | 5/9/2008 | 5/9/2008 | 5/9/2008 | | PART |
Jack Frank
|
|
|
wsuc stopped at site
|
Electrical Rough-In | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Jack Frank
|
|
|
ground inspection tied to rebar in foundation Phone #: ###-#### Internet Inspection Request from: Brandon Blackham electrode ok
|