Final | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | PASS |
Pat Lass
|
|
|
Can you please call 20 minutes prior to arival. Thanks. Phone #: ###-#### Internet Inspection Request from: John Edwards no esc in project
|
Electrical Rough-In | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Pat Lass
|
|
|
nead ok to cover for the kitchen area or what we call phase 2 of the prodject. Phone #: ###-#### Internet Inspection Request from: John Edwards no sec
|
Final | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PART |
Pat Lass
|
|
|
john Note: Partial final please call 1/2 hr prior to call with about the inspection Phone #: ###-#### Phase 1 ok kitchen area is phase 2
|
Electrical Rough-In | 4/30/2008 | 5/1/2008 | 5/1/2008 | A | PASS |
Pat Lass
|
|
|
john - floor heat - first thing in the morning if possible Phone #: ###-####
|
Electrical Rough-In | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PASS |
Mike Kinnear
|
|
|
Need cover inspection. Please call John ###-####, 30 min. before, to make sure you can get in. Phone #: ###-#### Internet Inspection Request from: John Edwards ok cover ri
|
Electrical Rough-In | 3/17/2008 | 3/17/2008 | 3/18/2008 | P | PART |
Pat Lass
|
|
|
Inspection is for floor joist area between first and second floor that will be covered. Thanks John Phone #: ###-#### Internet Inspection Request from: John Edwards floor joist area between first and second floor ok
|