Final | 4/17/2008 | 4/17/2008 | 4/17/2008 | A | PASS |
Bob Reichert
|
|
|
This job is inside the boise airport. on your way out there please call brian with CNI and he will meet you at the construction entrance so that he can escourt you to the job with as little hassle as possible. Brian # ###-####. This is a final inspection on the remodel at the varsity grill. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean met contactor, called electrician, ok to final, signed occupancy card
|
Electrical Rough-In | 3/13/2008 | 3/13/2008 | 3/13/2008 | A | PART |
Jack Frank
|
|
|
Rough in inspection for the walls in the new seating area Phone #: ###-#### Internet Inspection Request from: Spencer Mclean new wall ok
|