Electrical Rough-In | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PASS |
Bob Reichert
|
|
|
Meet Kyke Sharp at 8:00 am for inspection , his # is ###-#### Phone #: ###-#### Internet Inspection Request from: gary batten met contractor, ric ok
|
Final | 4/4/2008 | 4/4/2008 | 4/4/2008 | A | PASS |
Bob Reichert
|
|
|
Meet Kyke Sharp at 8:00 am for inspection , his # is ###-#### Phone #: ###-#### Internet Inspection Request from: gary batten met contractor, ok to final
|
Electrical Rough-In | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | NH |
William E Thomas
|
|
|
This is the Hertz bldg next door to the gas station. These circuits are ready for inspection. Phone #: ###-#### Internet Inspection Request from: gary batten . .1. no access to roof, they will call and set up time with bob for complete inspection. . .
|