Final | 6/2/2009 | 6/3/2009 | 6/3/2009 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alison Pennington called, ok to final
|
Final | 6/1/2009 | 6/2/2009 | 6/2/2009 | A | NH |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alison Pennington called, no key available, will recall, fee due
|
Electrical Rough-In | 4/3/2008 | 4/3/2008 | 4/3/2008 | P | PASS |
Pat Lass
|
|
|
Reinspection needed. Phone #: ###-#### Internet Inspection Request from: Alison Pennington will check for required recep and proper connectors on romex at panels on final.
|
Permanent Service | 4/3/2008 | 4/3/2008 | 4/3/2008 | P | PASS |
Pat Lass
|
|
|
Reinspection needed. Phone #: ###-#### Internet Inspection Request from: Alison Pennington P/S U/G N Ok
|
Electrical Rough-In | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | FAIL |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alison Pennington add required recep and 6 in free conductor
|