Final | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PASS |
Bob Reichert
|
|
|
Call John at ###-#### to get access Phone #: ###-#### Internet Inspection Request from: John Campbell ok to final, signed structural card, no esc this project
|
Permanent Service | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | PASS |
Bob Reichert
|
|
|
Please call Barry at ###-#### for access into the building. Phone #: ###-#### Internet Inspection Request from: John Campbell p/s exst meter pak n ok, no esc this project
|
Rough-In Permanent Service | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 1:09:53 PM. Contact: ###-####. see conference
|
Conference | 6/11/2008 | 6/11/2008 | 6/11/2008 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 1:09:53 PM. Contact: ###-####. met electricians, told that meter area needs labels as well as panels, phase identification required, repair feeder conduit to space, address store front, provide panel schedules, no esc
|
Electrical Rough-In | 4/15/2008 | 4/15/2008 | 4/15/2008 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Campbell walls only ok to cover
|
Electrical Rough-In | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | NH |
Bob Reichert
|
|
|
John please call for lock box info Phone #: ###-#### met contractor, locked out, fee due
|