Final | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PASS |
Bob Reichert
|
|
|
allen Phone #: ###-#### ok to final, signed structural card, no esc this project
|
Electrical Rough-In | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Pat Lass
|
|
|
ROB WILLIS Phone #: ###-#### Internet Inspection Request from: Randy Vail anop
|
Electrical Rough-In | 6/16/2008 | 6/17/2008 | 6/16/2008 | A | PART |
Jack Frank
|
|
|
rob - cover Phone #: ###-#### ceilings ok where new lighting was installed in central scheduling area tiles are to be out where power poles will be installed see jack for info if ?
|