Final | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Celinda Winters no esc permit plans on site
|
Final | 6/6/2008 | 6/9/2008 | 6/9/2008 | A | FAIL |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Celinda Winters box in cabinet shall be flush and GFCI protect bath fans in shower areas plans on site and no esc permit
|
Electrical Rough-In | 5/29/2008 | 5/29/2008 | 5/29/2008 | P | PART |
Pat Lass
|
|
|
for cover please - jade Phone #: ###-#### grid ceiling ok no ESC permit approved plans on sight
|
Electrical Rough-In | 5/28/2008 | 5/29/2008 | 5/29/2008 | A | NR |
Pat Lass
|
|
|
jade - cover Phone #: ###-####
|
Electrical Rough-In | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
Pat Lass
|
|
|
relocated panel Phone #: ###-#### Internet Inspection Request from: Celinda Winters
|
Conference | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | PART |
Pat Lass
|
|
|
Conference with Winters Electric and Wright Brothers regarding relocating panel below duct work requested by General Contractor Robert Grubb @ ###-#### Phone #: ###-#### Internet Inspection Request from: Celinda Winters discussed minimum height requirements and dedicated work space for panel
|
Electrical Rough-In | 4/28/2008 | 4/30/2008 | 4/30/2008 | A | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Celinda Winters see conference
|
Conference | 4/30/2008 | 4/30/2008 | 4/30/2008 | P | DONE |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Celinda Winters talked about BCC no violations shall be retained, clean up work that was existing, relocate panel, make old location junction box, ceiling work, no raceways in valley of metal 2x4 studs
|