Final | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 11:00:04 AM. Contact: ###-####. . .1. final ok. . .
|
Final | 5/7/2008 | 5/7/2008 | 5/7/2008 | A | CANC |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 6:33:57 AM. Contact: ###-####. . .1. wrong type insp., should be ri, see ri for this date in the am. . .
|
Electrical Rough-In | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 6:33:57 AM. Contact: ###-####. . .1. ri ok. . . . .2. walls only. . .
|