Final | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brandon Blackham
|
Electrical Rough-In | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PASS |
Pat Lass
|
|
|
brandon - bonding Phone #: ###-#### grid ok
|
Electrical Rough-In | 5/6/2008 | 5/6/2008 | 5/6/2008 | P | PART |
Pat Lass
|
|
|
Potting of pool light Phone #: ###-#### Internet Inspection Request from: Brandon Blackham potting ok
|
Electrical Rough-In | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | PART |
Pat Lass
|
|
|
Bonding of pool and underground Phone #: ###-#### Internet Inspection Request from: Brandon Blackham partial bonding ok
|