Final | 3/31/2009 | 4/2/2009 | 4/2/2009 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS PAT PLEASE CALL ERIC AT 8:AM THANKS final ok with survey for required receps above kitchen counter.
|
Final | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | FAIL |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS install required receps above counter by kitchen sink install proper sized boxes at built in glass shelves and the other sicde of that wall. GFCI protect receps within 6 ft of sink in mud room flex not permited with nm boxes by kitchen sink means of support to be external on nm boxes
|
Electrical Rough-In | 1/14/2009 | 1/15/2009 | 1/15/2009 | A | PASS |
Pat Lass
|
|
|
Please inspect floor heat installation in kitchen. Rock ###-#### Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS
|
Electrical Rough-In | 11/21/2008 | 11/21/2008 | 11/21/2008 | P | PASS |
Pat Lass
|
|
|
please inspect the floorheat in master bath. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS
|
Electrical Rough-In | 10/29/2008 | 10/30/2008 | 10/30/2008 | A | PASS |
Pat Lass
|
|
|
Please inspect floor heat installed on island counter top. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS cable heat ok to cover
|
Rough-In Permanent Service | 8/12/2008 | 8/12/2008 | 8/12/2008 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS R/I Ok P/S U/G N Ok
|
Electrical Rough-In | 5/2/2008 | 5/5/2008 | 5/5/2008 | A | PART |
Pat Lass
|
|
|
Please inspect floor outlet and conduit. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS flooroutlet ok
|
Electrical Rough-In | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | NR |
Pat Lass
|
|
|
Installing a floor outlet box and conduit in basement floor. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS no work done
|