Final | 6/26/2008 | 6/26/2008 | 6/26/2008 | P | PASS |
Mike Kinnear
|
|
|
Per Jim Schmer, we are supposed to have someone present at this inspection. Please call us 1 hour in advance so we can get there. This is the final inspect for the "Vanilla Shell" which includes the outlets and switches that have covers and includes the lighting. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery ok final no esc permit in project
|
Electrical Rough-In | 6/3/2008 | 6/4/2008 | 6/4/2008 | A | PASS |
Mike Kinnear
|
|
|
This is a ceiling and rough inspect for the Vanilla Shell TI. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery ok cover ceiling only note no esc permit
|
Final | 6/3/2008 | 6/4/2008 | 6/3/2008 | A | CANC |
Mike Kinnear
|
|
|
This is the ceiling inspect and also the final electrical inspect. There are 4 permits being scheduled for this job to account for all panels. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery Inspection cancelled from web by: Richard Montgomery
|
Electrical Rough-In | 6/2/2008 | 6/2/2008 | 6/3/2008 | P | FAIL |
Mike Kinnear
|
|
|
This is a ceiling inspection for the Vanilla Shell Tenant Improvement on the left side of the building. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery nec210.62 show window receptacles note no esc permit t/w contractor they need to get the right address on this permit & a permit for each meter they need to energies.
|
Electrical Rough-In | 5/16/2008 | 5/16/2008 | 5/16/2008 | A | PASS |
William E Thomas
|
|
|
Carriage Crossing Building. This is the rough inspect for the Vanilla Shell TI only which occupies the left side of the building. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery . .1. walls and hardlids ok for cover. . .
|