Final | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Jack Frank
|
|
|
equip tested and labeled field evaluation ok
|
Conference | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | DONE |
Jack Frank
|
|
|
Good morning Jack, This is the conference for the UL stickers issue. Mucho cant be there, is has to be on another jobsite, I told the owner he will need to be there to show you all of the equipment. The owners (Kevin) cell phone number is ###-####, you might give him a call when your about 30min. out to make sure he will be there. If you have any questions please call me on my cell at ###-####, Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig listing for 2 machines and maybe the lazer equipment ,it has a label on seperate unit that attached to it met owner
|
Conference | 9/23/2008 | 9/23/2008 | 9/23/2008 | A | DONE |
Jack Frank
|
|
|
met with Don Robb with Intertek
|
Final | 8/28/2008 | 8/29/2008 | 8/29/2008 | P | PART |
Jack Frank
|
|
|
Hi Jack, We are ready for the temp. final for this project (this is the one without UL listings on the presses, that is why we need a temp.), according to the owner the UL inspectors are scheduled to come here around the end of September, but I don''t have an exact date. Mucho should be on site, if you can''t find him his cell number is ###-####. Give me a call if you have any questions. t/o ok card signed note needs all equipment to be labeled and listed Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig
|
Electrical Rough-In | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Jack Frank
|
|
|
Good morning Jack, I need a rough-in cover inspection for the 1st floor T-grid area''s. Mucho should be onsite if you have any questions, his cell number is ###-####. ceilings ok Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig
|
Electrical Rough-In | 7/14/2008 | 7/15/2008 | 7/15/2008 | A | CANC |
William E Thomas
|
|
|
Good morning Jack, I need the 2nd floor walls inspected for this T\I. If you have any questions please call. Mucho should be on site until around 3:00PM. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig . .1. ri ok. . . . .2. walls only on 2nd floor. . .
|
Electrical Rough-In | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | PART |
Jack Frank
|
|
|
Jack, I need the first floor walls inspected in the office area''s, Mucho will be on site until 3:00PM to walk you through the area''s. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig ok
|
Conference | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | DONE |
Jack Frank
|
|
|
Jack, I need the first floor walls inspected in the office area''s, Mucho will be on site until 3:00PM to walk you through the area''s. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig correction posted for equipment (printing presses) not listed or labeled, BCC 4.5.60. NEC 110.2
|
Electrical Rough-In | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PART |
Jack Frank
|
|
|
call mucho onsite for inspection areas Phone #: ###-#### walls restroom and equip rm ok
|
Electrical Rough-In | 6/23/2008 | 6/24/2008 | 6/24/2008 | A | PART |
Jack Frank
|
|
|
Wayne- 2nd floor ceiling cover inspection Phone #: ###-#### no ESC attached r/i ok
|
Permanent Service | 6/20/2008 | 6/20/2008 | 6/20/2008 | P | DONE |
Jack Frank
|
|
|
Wayne Panel L1 Phone #: ###-####
|
Rough-In Permanent Service | 6/19/2008 | 6/20/2008 | 6/20/2008 | A | PASS |
Jack Frank
|
|
|
wayne - rough in is for ceiling on 1st floor Phone #: ###-#### ceiling ok p/s u/g new for L1
|
Permanent Service | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | PART |
Jack Frank
|
|
|
Wayne Phone #: ###-#### conference with contr and ID power inspection ok for work done
|
Electrical Rough-In | 5/29/2008 | 5/29/2008 | 5/29/2008 | P | PART |
Jack Frank
|
|
|
wayne-- r/i under slab Phone #: ###-#### ok no ESC permit
|