Final | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Jack Frank
|
|
|
Call for access Phone #: ###-#### ok no card posted
|
Final | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/11/2008 at 6:10:59 PM. Contact: ###-#### corr called 110.3(B) use manufactures breakers only, told contr that at 1st inspection, 408.4 shall provide a panel schedule that is current , and be specific.
|
Final | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | NH |
Jack Frank
|
|
|
George Phone #: ###-#### called notice posted
|
Electrical Rough-In | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | PART |
Jack Frank
|
|
|
George Phone #: ###-#### walls ok only shall correct violations iabove grid ceiling, open boxes box fill seal KOs remove unused jboxes and wiring layed on ceiling tiles no ESC talked with contr
|
Electrical Rough-In | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | NR |
Jack Frank
|
|
|
George; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt contr called inspection went to 324, ele contr said he used cutin boxes there are not flush I told no cutin boxes for new work and boxes used shall be flush with finish surface
|