Final | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 8/20/2008 at 7:28:02 AM. Contact: ###-####. ok final note no esc permit in project
|
Electrical Rough-In | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
William E Thomas
|
|
|
jim - floor heat in bathroom - please call 1/2 hr prior to inspection Phone #: ###-#### . .1. floor ok to cover. . .
|
Electrical Rough-In | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | PASS |
William E Thomas
|
|
|
jim Phone #: ###-#### - please call 1/2 hr prior to inspection . .1. ri ok. . .
|
Final | 6/3/2008 | 6/4/2008 | 6/4/2008 | A | NH |
William E Thomas
|
|
|
Jim Phone #: ###-#### . .1. not home, called and spoke to contractor and posted message. . .
|
Electrical Rough-In | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | CANC |
Pat Lass
|
|
|
jim Note: floor heat in bathroom Phone #: ###-#### this is a dead zone for phone and with confusion in notes will reschedual.
|