Final | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Pat Lass
|
|
|
Keith Johnson Phone #: ###-#### Internet Inspection Request from: janet johnson
|
Final | 9/17/2008 | 9/18/2008 | 9/18/2008 | P | FAIL |
Pat Lass
|
|
|
Keith Johnson Phone #: ###-#### Internet Inspection Request from: janet johnson 2 screws for raised covers
|
Electrical Rough-In | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | PASS |
Mike Kinnear
|
|
|
Giraffe Holding rough-in Call Eddy Phone #: ###-#### Internet Inspection Request from: janet johnson ok cover walls only
|
Electrical Rough-In | 6/26/2008 | 6/27/2008 | 6/27/2008 | P | PART |
Jack Frank
|
|
|
under slab pvc Phone #: ###-#### Internet Inspection Request from: janet johnson u/g giraffe house ok
|
Electrical Rough-In | 6/25/2008 | 6/27/2008 | 6/26/2008 | A | CANC |
Pat Lass
|
|
|
Under slab work Phone #: ###-#### Internet Inspection Request from: janet johnson Inspection cancelled from web by: janet johnson
|
Electrical Rough-In | 6/11/2008 | 6/11/2008 | 6/11/2008 | A | PASS |
William E Thomas
|
|
|
Trenches ready at your earliest convenience Phone #: ###-#### Internet Inspection Request from: janet johnson . .1. underground ok. . .
|
Electrical Rough-In | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PART |
Pat Lass
|
|
|
This is a continuation of the trench inspections. Could you please inspect between 1-2pm? We are all on a very tight schedule and working with several trades in the same trench. Thanks Phone #: ###-#### Internet Inspection Request from: janet johnson partial U/G Ok all that is left is from the J-box to the class/storage bld.
|
Electrical Rough-In | 6/8/2008 | 6/9/2008 | 6/9/2008 | A | PART |
Pat Lass
|
|
|
Several trades are utlizing a common trench that blocks access to the job. The GC is asking that we have your inspection between 11am and 12pm. All trades will be installing conduit as they trench and this will not be ready before 11am but will need to be closed up soon after 12pm for job access. Phone #: ###-#### Internet Inspection Request from: janet johnson partial u/g ok to cover with spacing and bedding first. plan on site
|