Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE08-01508
StatusFinaled
Name ACTIVE WIRING COMPANY
Site Address 9050 W OVERLAND RD Unit: 100
Project Name 
Customer Number 
ePlanReview 
Description
Electrical Permit - New: Brown Mackie College Tenant improvement
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/26/20088/27/20088/27/2008APASS
DetailsBob Reichert
Mike Phone #: ###-#### corrections made, ok to final, signed occupancy card, no esc this project
Final8/22/20088/25/20088/25/2008AFAIL
DetailsJack Frank
Phone #: ###-#### Internet Inspection Request from: Don Lustig note controller for exam room fixture listing mark does not look correct it's a ETL with no number and does not say what it is or listed meet with gen. contr corr posted 110.2
Final8/14/20088/14/20088/14/2008APART
DetailsBob Reichert
Hello we fixed all on the list but the surgical light this item still does not have proper documents so i will not hang. they will return it please temp jobsite Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig corrections made except for light on 2nd floor and receptacle clips for furniture, signed t/o card. After weekend move, they will call for final, no esc this project
Final8/13/20088/13/20088/13/2008PPART
DetailsBob Reichert
Looking for upstairs final or temp Phone #: ###-#### Internet Inspection Request from: Don Lustig met contractor, left correction notice, BCC shall find and provide installation instructions for lighr and controller-fixture has label, controller doesn't, shall complete installation, shall box or abandon mc in floor, there shall be no open boxes, furniture shall be completely assembled, shall install receptacle faceplates,, Note: this is 2nd floor only, can give t/o when done, then final after move over weekend
Final8/7/20088/7/20088/7/2008PPART
DetailsBob Reichert
Bob requested maybe to have a final inspection in parts. This is for half or all first floor. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig looked at 1st floor only, left correction notice,NEC605.7 shall provide means to simultaneously disconnect all ungrounded conductors for furniture, 110.3(B) listed equipment shall be installed per instructions included in listing (furniture), no esc this project
Electrical Rough-In8/5/20088/5/20088/5/2008PPASS
DetailsBob Reichert
Hello the final ceilings 2nd floor are ready for grid cover. Matt is on site Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok to cover last 4 rooms 2nd floor ceilings, couldn't find plans to mark, no esc this project
Rough-In Permanent Service8/1/20088/1/20088/1/2008PCANC
DetailsJack Frank
2nd floor panels ready for inspection Panel K L M N J Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig talked to contr about permits foe each meter
Electrical Rough-In7/30/20087/30/20087/30/2008PPART
DetailsBob Reichert
DON NOTE: 2ND FL - CEILING GRID COVER Phone #: ###-#### 2nd floor ceilings ok to cover anop except 4 rooms, no esc this project
Rough-In Permanent Service7/28/20087/28/20087/28/2008APASS
DetailsBob Reichert
Hello i need panels 1st floor A B C D E F G H. I will call the city this morning and make sure the permit is stait for the suite Phone #: ###-#### Internet Inspection Request from: Don Lustig ric ok, p/s, exst meter pak, n, ok, 8 meters required for downstairs, will need more for upstairs later, no esc this project
Electrical Rough-In7/25/20087/25/20087/25/2008PPASS
DetailsBob Reichert
Hello we are ready for 1st floor drop ceiling cover. Matt will be on site for walk thur. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok to cover 1st floor ceilings only, no esc this project
Electrical Rough-In7/24/20087/24/20087/24/2008APART
DetailsBob Reichert
This for the 2nd floor bath hard lids and wall cover old edward jones space. Matt is on site to walk though. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig 2nd floor only hard lids and old edward jones walls only ok to cover, no esc this project
Electrical Rough-In7/20/20087/21/20087/21/2008PPART
DetailsBob Reichert
This is for the last 1st floor hard lids which are the lobby and electrical room. Also the General wants a consoltation for a 1st floor grid cover inspection borders only. Phone #: ###-#### Internet Inspection Request from: Don Lustig lobby hard lid, borders 1st floor only ok- will leave open if boxes and coordinate with electrician where working on heaters, no esc this project
Electrical Rough-In7/16/20087/16/20087/16/2008APART
DetailsBob Reichert
Hello I need ceiling cover for 1st floor hard lids contact Don or Matt ###-#### on site for locations. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig hard lids 1st floor only except lobby and electrical room ok to cover, no esc this project
Electrical Rough-In7/11/20087/11/20087/11/2008PCANC
DetailsBob Reichert
Contact Matt on site for RI inspection on hard lids 1st floor Phone #: ###-#### Internet Inspection Request from: Don Lustig Inspection cancelled from web by: Alexandra Rahn
Electrical Rough-In6/27/20086/30/20086/30/2008APART
DetailsJack Frank
Inspection is for the 2nd floor wall cover Lab Rooms where we had to rewire. Matt ###-#### will be on site to walk thur. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok
Electrical Rough-In6/26/20086/26/20086/26/2008PPASS
DetailsBob Reichert
Hello the general has something in writing stating no paitent care contact Matt on site for a walk though. inspection for RI wall cover second floor Thanks ###-#### Matt Phone #: ###-#### Internet Inspection Request from: Don Lustig checked with general contractor about statement they received regarding no requirements for medical grade equipment, ric walls only south 1/2 2nd floor
Electrical Rough-In6/25/20086/25/20086/25/2008PPART
DetailsBob Reichert
Hello contact Matt on site he will walk though the second floor walls with you for cover Phone #: ###-#### Internet Inspection Request from: Don Lustig met contractor, told needs to show whether or not patient care occurs at facility. ric north 1/2 2nd floor only ok to cover, will call for other 1/2 when known about patient care
Electrical Rough-In6/16/20086/16/20086/16/2008PPASS
DetailsMike Kinnear
Hello latter in the afternoon if possible. Matt is the foreman on site for a walk thur. This inspection is for 1st floor wall cover. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok cover walls only 1st floor. note t/w don regarding address they to get it correct (not suit 260) note no esc permit in project