Final | 9/26/2008 | 9/29/2008 | 9/29/2008 | A | PASS |
Bob Reichert
|
|
|
justin Phone #: ###-#### met owner, ok to final
|
Final | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | CANC |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 9/25/2008 at 9:20:17 PM. Contact: ###-####. t/w owner he wants bob to do the inspection
|
Rough-In Permanent Service | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | PASS |
Bob Reichert
|
|
|
justin - please call 1/2 hr prior Phone #: ###-#### ric ok/ p/s o/h n ok
|
Rough-In Permanent Service | 9/3/2008 | 9/4/2008 | 9/4/2008 | A | FAIL |
Bob Reichert
|
|
|
John- call 30 min prior to going Phone #: ###-#### met owner, BCC all make-up shall be done for receptacles in shop, service conductors shall be 4/0 aluminum, not 1/0 in riser, will correct and recall
|
Electrical Rough-In | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | FAIL |
Pat Lass
|
|
|
justin - and final on service - please call prior so he can meet you there Phone #: ###-#### no electrode, se not permited underground, raceway to extend to panel, protect romex parallel
|
Conference | 6/27/2008 | 6/30/2008 | 6/30/2008 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/27/2008 at 5:29:16 PM. Contact: ###-####. met owner, talked about service disconnect at pole, and bringing rest of building up to code, old panel ok for service disconnect, will need several ko seals, will probably abandon sub-panel
|