Final | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 9:10:19 PM. Contact: ###-####.
|
Electrical Rough-In | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PASS |
Mike Kinnear
|
|
|
Alan- all around pool will be concrete Phone #: ###-#### ok cover under ground conduit
|
Electrical Rough-In | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | PASS |
Mike Kinnear
|
|
|
alan - pool bonding Phone #: ###-#### ok cover pool bonding only
|