Final | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PASS |
Bob Reichert
|
|
|
ok to final
|
Electrical Rough-In | 8/18/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/18/2008 at 6:49:26 AM. Contact: ###-####. u/g west and south ok to cover, will have contractor do power installation
|
Electrical Rough-In | 8/8/2008 | 8/8/2008 | 8/8/2008 | P | PASS |
Bob Reichert
|
|
|
MIKE Phone #: ###-#### rest of north end u/g ok to cover, need to see west and south end u/g
|
Electrical Rough-In | 8/7/2008 | 8/8/2008 | 8/8/2008 | A | PART |
Bob Reichert
|
|
|
mike Note: underground conduit Phone #: ###-#### part north end pool ok to cover, will see pool cover u/g next trip
|
Electrical Rough-In | 7/30/2008 | 7/31/2008 | 7/31/2008 | A | PASS |
Bob Reichert
|
|
|
mike Phone #: ###-#### pool bonding and underwater light bonding only ok, no underground done yet
|
Electrical Rough-In | 7/30/2008 | 7/30/2008 | 7/30/2008 | A | CANC |
Bob Reichert
|
|
|
Mike ###-#### see conference
|
Conference | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | DONE |
Bob Reichert
|
|
|
Mike ###-#### met oener, talked about #8 solid copper for bonding, non-metallic pvc to pool lights, approved clamps for concrete encasement, burial depth for raceways
|