Final | 6/10/2009 | 6/11/2009 | 6/11/2009 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/10/2009 at 3:53:04 PM. Contact: ###-####. iok to final
|
Rough-In Permanent Service | 8/6/2008 | 8/6/2008 | 8/6/2008 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/6/2008 at 7:49:10 AM. Contact: ###-####. r/i p/s u/g new ok
|
Rough-In Permanent Service | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | FAIL |
Jack Frank
|
|
|
Tom Phone #: ###-#### corr, called box fill switch bed rm outlet spacing M bed rm 300.4 nail plates and 11/4", 314.43 nails in outside boxes, 334.30 staples cables 8" of boxes, 300.14 short grd wires at boxes, 334.23 protect cables within 6ft of attic accesses
|