Final | 5/13/2009 | 5/14/2009 | 5/14/2009 | A | PASS |
Bob Reichert
|
|
|
jason Phone #: ###-#### corrections made, ok to final, signed structural card
|
Electrical Rough-In | 5/11/2009 | 5/11/2009 | 5/12/2009 | P | PART |
Jack Frank
|
|
|
Jason Phone #: ###-#### entry ceiling ok some support needed contr will correct
|
Conference | 5/12/2009 | 5/12/2009 | 5/12/2009 | A | DONE |
Jack Frank
|
|
|
Jason Phone #: ###-####-wall talked with contr. about ID of different voltages, phases and neutral, grding of separately derived systems
|
Final | 5/8/2009 | 5/8/2009 | 5/8/2009 | P | PART |
Bob Reichert
|
|
|
Jason Phone #: ###-#### 1st floor ok except main entry requires ceiling inspection , told to remove tiles and support cables, they will check 3rd floor and recall if all corrections made
|
Final | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | FAIL |
Bob Reichert
|
|
|
Tom Phone #: ###-#### met contractor for roof top only, left correction notice, NEC 110.26(A)(2) shall provide at least 90 degree door opening for boiler controllers, 110.26(F)(1)shall provide dedicated space over controllers, with part (b) - nthere shall be no foreign piping over dedicated space, 400.8 shall not use so cord for fixed wiring, 408.4 shall provide circuit directories, 110.16 shall provide flash protection warning signs,200.6(A) shall identify grounded conductor, 110.22 shall identify disconnects
|
Final | 4/28/2009 | 4/28/2009 | 4/28/2009 | P | PART |
Bob Reichert
|
|
|
tom Phone #: ###-#### ok to final floor 2&3 only
|
Electrical Rough-In | 4/8/2009 | 4/8/2009 | 4/8/2009 | P | PART |
Mike Kinnear
|
|
|
jason Phone #: ###-#### ok ri 3rd floor anop
|
Electrical Rough-In | 3/23/2009 | 3/24/2009 | 3/24/2009 | A | PART |
Jack Frank
|
|
|
Jason Phone #: front entry walls and hard ceing anop
|
Electrical Rough-In | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PASS |
Mike Kinnear
|
|
|
Jason Phone #: ###-#### ok cover grid ceiling asop
|
Permanent Service | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Bob Reichert
|
|
|
jason Phone #: ###-#### corrections made, p/s u/g n ok, 4 meters
|
Electrical Rough-In | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Bob Reichert
|
|
|
jason Phone #: ###-#### south stair walls only ok to cover anop
|
Permanent Service | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | FAIL |
Bob Reichert
|
|
|
jason Phone #: ###-#### met contractor, NEC 110.3 lugs for service disconnects shall be per listing and labelling for neutral and ground and installed per instructions
|
Electrical Rough-In | 1/23/2009 | 1/26/2009 | 1/26/2009 | A | PART |
Jack Frank
|
|
|
jason Note: ceiling Phone #: 353-174 outside soffit west entry
|
Electrical Rough-In | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | PASS |
Bob Reichert
|
|
|
JASON Phone #: ###-#### walls for patio and stairwells ok to cover anop
|
Permanent Service | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | CANC |
Bob Reichert
|
|
|
JASON Phone #: ###-#### see conference
|
Conference | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | DONE |
Bob Reichert
|
|
|
JASON Phone #: ###-#### reviewed grounding for services and labelling, terminations
|
Electrical Rough-In | 12/17/2008 | 12/18/2008 | 12/18/2008 | P | PART |
Jack Frank
|
|
|
dale Phone #: ###-#### parapet wiring roof ok anop
|
Conference | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | DONE |
Bob Reichert
|
|
|
dale Phone #: ###-#### talked about re-route of fire pump conduit from service. They will re-route broken u/g
|
Electrical Rough-In | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | PASS |
Bob Reichert
|
|
|
Dale- Underground Phone #: ###-#### ok to cover u/g for communications east side building, electrical contractor installed
|
Electrical Rough-In | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PASS |
Bob Reichert
|
|
|
dale - uffer Phone #: ###-#### concrete encased electrode ok to pour
|
Electrical Rough-In | 9/5/2008 | 9/8/2008 | 9/8/2008 | A | PART |
Bob Reichert
|
|
|
dale- underground Phone #: ###-#### ok to cover u/g from temp pole south toward street- will put splice box in planter, will cut street later for generator feeders
|
Electrical Rough-In | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PASS |
Bob Reichert
|
|
|
Dale- first thing if possible Phone #: ###-#### east side u/g ok to cover under building
|
Electrical Rough-In | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PART |
Pat Lass
|
|
|
Dale Phone #: ###-#### from electrical room 30 ft east ok to cover underground
|
Electrical Rough-In | 8/19/2008 | 8/20/2008 | 8/20/2008 | P | CANC |
Bob Reichert
|
|
|
Dale Phone #: ###-#### see conference
|
Conference | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | DONE |
Bob Reichert
|
|
|
Dale Phone #: ###-#### talked with electrical contractor about being ready for inspection, doing in parts for u/g because of depth and sluff box, conduit spacers side by side and top cover row, meters at transformer, but contractor doing work up to disconnects inside building, so city will inspect, general calling in inspections, so electrical contractor will have to co-ordinate when inspection to be requested
|
Electrical Rough-In | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PASS |
Bob Reichert
|
|
|
Dale Phone #: ###-#### ok to cover u/g for site lighting only- south box then west side of lot to north box
|