Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE08-02250
StatusFinaled
Name R M E INC
Site Address 800 W IDAHO ST
Project Name 
Customer Number 
ePlanReview 
Description
Electrical Permit - New: INSTALL PANELS & LIGHTS PER PLANS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Service10/21/200810/22/200810/22/2008ACANC
DetailsBob Reichert
PAUL Phone #: ###-#### Internet Inspection Request from: Sean DeLacy wrong type inspection request, see final no esc this project
Final10/22/200810/22/200810/22/2008APASS
DetailsBob Reichert
PAUL Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to final core and shell, signed structural card, panels ok for seals, checked baths, no esc this project
Rough-In Permanent Service10/15/200810/16/200810/16/2008PPART
DetailsPat Lass
PAUL Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
switch gear ok
Conference9/26/20089/29/20089/29/2008ACANC
DetailsJim Schmer
PAUL Phone #: ###-#### Internet Inspection Request from: Sean DeLacy panel bussing can be replaced in old panel with new doors and etc. There will be no air gaps around panel at all or they will not be approved. Sealing SHALL not be with combustible material. JMS
Conference9/23/20089/24/20089/24/2008ADONE
DetailsBob Reichert
DAVE Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met contractor, ok to saw-cut floor and provide depressed floor and to move false ceiling to allow gear to fit without going in between floor joists, they will either put in small sump pump or curbing in floor, no esc this project
Conference9/22/20089/23/20089/23/2008APART
DetailsPat Lass
PAUL Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
talked with paul about the switch gear and saw it put together I told him that we have to try to get gear that will fit and if that is impossible we might justify a reduction in clearance that provides comparable safety.
also in order to replace only guts to exixting panels they would have to be an exact fit.
Conference9/15/20089/16/20089/16/2008APART
DetailsPat Lass
SCOTT Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
talked about clearance for new switch gear
Electrical Rough-In9/2/20089/2/20089/2/2008PPART
DetailsPat Lass
SCOTT BATHROOM Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
grape escape bathroom ok
Final8/27/20088/27/20088/27/2008PPART
DetailsWilliam E Thomas
SCOTT BATHROOMS Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
. .1. see other for this date. . .
Electrical Rough-In8/20/20088/20/20088/20/2008PPASS
DetailsMike Kinnear
Phone #: ###-#### Internet Inspection Request from: Tyler Bowen ok cover 2 bathrms anop note t/w scott they needed to get the address corrected or no more inspection. no esc permit in project
Conference8/12/20088/12/20088/12/2008APART
DetailsPat Lass
SCOTT Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
talked about GFCIs and permits