Final | 11/20/2008 | 11/21/2008 | 11/21/2008 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot ok
|
Electrical Rough-In | 11/5/2008 | 11/6/2008 | 11/6/2008 | A | PASS |
Bob Reichert
|
|
|
floor heat Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot corrections made, ok to cover floor heat only
|
Electrical Rough-In | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | FAIL |
Jack Frank
|
|
|
floor heat inspection Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot correction not made still violation spacing and cable loose and no manufactures instructions called corr posted do not cover posted
|
Electrical Rough-In | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | FAIL |
Bob Reichert
|
|
|
Not sure what to call this inspection. It is for the floor heat. Thanks Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot called, left message, left correction notice, NEC 110.3 shall install cable per manufacturers installation instructions- never at 1", always at least 2" spacing
|
Electrical Rough-In | 10/31/2008 | 11/3/2008 | 11/3/2008 | P | CANC |
Bob Reichert
|
|
|
Not sure what to call this inspection, but it is for the floor heat. Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot Inspection cancelled from web by: Barbara Szurgot
|
Electrical Rough-In | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Bob Reichert
|
|
|
basement addition rough in with new sub panel Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot called contractor, ric basement area ok
|
Electrical Rough-In | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PASS |
Bob Reichert
|
|
|
Inspect trench for floor outlets in basement Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot u/g only ok to cover
|