Final | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/25/2008 at 10:23:25 AM. Contact: ###-####.
|
Rough-In Permanent Service | 9/2/2008 | 9/2/2008 | 9/2/2008 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 7:28:20 AM. Contact: ###-####. no approved plan on site will check for required receps on final called contractor and informed him that kitchen counter looked like it would require a recep above counter to serve pininsula and also no the end. inter connect bonding bus to be installed prior to fimal P/S U/G N Ok R/I Ok
|