ELE-Aging Inspection | 2/18/2015 | 2/18/2015 | 2/18/2015 | | DONE |
Rex Boyles
|
|
|
needed final see notes
|
Final | 2/18/2015 | 2/18/2015 | 2/18/2015 | P | PASS |
Rex Boyles
|
|
|
as per email from Shawn at RME they only did shell and core and no other work
|
ELE-Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | | DONE |
Rex Boyles
|
|
|
Shaun DeLacy says they did shell and core only and it was finaled out.
|
ELE-Aging Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | | DONE |
Rock A. Hudson
|
|
|
Still under construction
|
ELE-Aging Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 | | DONE |
Rock A. Hudson
|
|
|
Still under construction
|
ELE-Aging Inspection | 2/10/2014 | 2/10/2014 | 2/14/2014 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 11/1/2013 | 11/1/2013 | 11/1/2013 | | DONE |
Bob Reichert
|
|
|
still under construction until units completed
|
ELE-Aging Inspection | 8/2/2013 | 8/2/2013 | 8/5/2013 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 5/3/2013 | 5/3/2013 | 5/7/2013 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 2/1/2013 | 2/1/2013 | 2/1/2013 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 11/2/2012 | 11/2/2012 | 11/6/2012 | | DONE |
Bob Reichert
|
|
|
still under construction until call for final
|
ELE-Aging Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 5/4/2012 | 5/4/2012 | 5/4/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 2/3/2012 | 2/3/2012 | 2/3/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Final | 11/4/2011 | 11/7/2011 | 11/7/2011 | P | PART |
Bob Reichert
|
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok at generator, signed t/o card
|
Final | 11/3/2011 | 11/4/2011 | 11/4/2011 | P | PART |
Bob Reichert
|
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 1st floor corridor walls and rooms ok to final, adding labels and panel schedules, will verify generator grounding
|
Final | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | CANC |
Bob Reichert
|
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Final | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PART |
Bob Reichert
|
|
|
B2 L3 Units & hallway. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy corridor ceiling floor 1 only ok cover, corridors 2,3 ok final, rooms floors 2,3 ok part final
|
Electrical Rough-In | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | PASS |
Bob Reichert
|
|
|
Jason B1 L1 Soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover 1st floor soffits west part, ok 4th floor corridor ceilings
|
Final | 9/16/2011 | 9/19/2011 | 9/19/2011 | A | PART |
Bob Reichert
|
|
|
Greg Floors 1 B2 & B3 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy buildings 2&3 corridors anop ok final need to see attached rooms
|
Electrical Rough-In | 9/19/2011 | 9/19/2011 | 9/19/2011 | A | PASS |
Bob Reichert
|
|
|
ok cover elevator lobby both buidings, P1, elevator control rooms ok
|
Final | 9/15/2011 | 9/16/2011 | 9/16/2011 | A | PART |
Bob Reichert
|
|
|
Building 3 Floors 1-4 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy common and rooms part finalled, shall see after tenants make modifications, east side
|
Electrical Rough-In | 9/14/2011 | 9/14/2011 | 9/14/2011 | P | PASS |
Bob Reichert
|
|
|
Greg Phone #: ###-#### ok cover u/g walkway lighting west side entry
|
Electrical Rough-In | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PASS |
Bob Reichert
|
|
|
Greg Phone #: ###-#### ok cover u/g south side east and west
|
Electrical Rough-In | 9/2/2011 | 9/2/2011 | 9/2/2011 | P | PASS |
Bob Reichert
|
|
|
Underground---Jason Phone #: ###-#### ok cover u/g south of pool road, west side driveway, both sides
|
Electrical Rough-In | 8/19/2011 | 8/19/2011 | 8/19/2011 | P | PASS |
Bob Reichert
|
|
|
JASON B2 L1 SOFFITS Phone #: ###-#### >> Inspection requested via web by Sean DeLacy west side center u/g ok to cover, last 2 units soffits ok cover
|
Electrical Rough-In | 8/18/2011 | 8/18/2011 | 8/18/2011 | A | PASS |
Bob Reichert
|
|
|
Jason B2 L1 Soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy u/g ok in courtyard only, soffits ok 102, 103, anop
|
Electrical Rough-In | 8/18/2011 | 8/18/2011 | 8/18/2011 | P | CANC |
Bob Reichert
|
|
|
Jason. B2 1st floor soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Electrical Rough-In | 8/15/2011 | 8/15/2011 | 8/15/2011 | P | PASS |
Bob Reichert
|
|
|
Jason B2 2nd floor soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 2nd floor west end soffits ok to cover
|
Permanent Service | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | PASS |
Bob Reichert
|
|
|
ok to add meters as requested for units being completed, p/s ok'd earlier before job put on hold
|
Electrical Rough-In | 8/10/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Bob Reichert
|
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Sean DeLacy soffits 2nd floor anop ok
|
Electrical Rough-In | 8/8/2011 | 8/8/2011 | 8/8/2011 | P | PASS |
Bob Reichert
|
|
|
JASON BLG2 2ND FLOOR SOFFITS Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri ok 2nd floor anop
|
Electrical Rough-In | 8/5/2011 | 8/5/2011 | 8/5/2011 | A | PASS |
Bob Reichert
|
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Sean DeLacy soffits 2nd floor ok anop
|
Final | 8/5/2011 | 8/5/2011 | 8/5/2011 | A | CANC |
Bob Reichert
|
|
|
Soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Electrical Rough-In | 8/2/2011 | 8/2/2011 | 8/2/2011 | P | PASS |
Bob Reichert
|
|
|
Jason Underground Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover nw corner
|
Final | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | PART |
Daryl DeGrange
|
|
|
Jason. Underground, Finals Phone #: ###-#### >> Inspection requested via web by Sean DeLacy partial final units 101,102, 103 and rough-in ok cover underground southwest area for landscape lighting
|
Electrical Rough-In | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Doug A Poedy
|
|
|
Underground, Model Unit Finals & 1st floor soffit Phone #: ###-#### >> Inspection requested via web by Sean DeLacy. Underground east side planter. Soffet east side first floor. ok to cover.
|
Electrical Rough-In | 7/26/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Daryl DeGrange
|
|
|
JASON Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 3rd floor corridor, recessed cans in hard lid rough-in ok
|
Electrical Rough-In | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Bob Reichert
|
|
|
Jason Underground Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover u/g east side bldg
|
Electrical Rough-In | 7/21/2011 | 7/21/2011 | 7/21/2011 | P | PASS |
Bob Reichert
|
|
|
jason Phone #: ###-#### u/g sidewalk lights east side and soffits, 3rd floor anop ok
|
Electrical Rough-In | 7/19/2011 | 7/19/2011 | 7/19/2011 | P | PASS |
Bob Reichert
|
|
|
###-#### Office Phone #: ###-#### >> Inspection requested via web by Dan Mitchell ri ok, see final
|
Electrical Rough-In | 7/14/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Bob Reichert
|
|
|
Jason 1st floor soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy soffits anop ok
|
Electrical Rough-In | 7/13/2011 | 7/13/2011 | 7/13/2011 | A | PASS |
Bob Reichert
|
|
|
Jason B2 Common Areas Phone #: ###-#### >> Inspection requested via web by Sean DeLacy mens rr and suite anop ok cover ceilings
|
Electrical Rough-In | 7/11/2011 | 7/12/2011 | 7/12/2011 | A | PASS |
Bob Reichert
|
|
|
JASON SOFFITS B3 COMMON AREAS Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover ceilings anop, kitchen, rest room, guest suite
|
Electrical Rough-In | 7/7/2011 | 7/8/2011 | 7/8/2011 | A | PASS |
Bob Reichert
|
|
|
Jason B2 L4 Soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover soffits 4th floor anop
|
Electrical Rough-In | 6/29/2011 | 6/30/2011 | 6/30/2011 | A | PASS |
Bob Reichert
|
|
|
JASON B2 Common Area Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri anop ok
|
Electrical Rough-In | 6/22/2011 | 6/23/2011 | 6/23/2011 | P | PASS |
Bob Reichert
|
|
|
Jason B3 L2 & L4 soffit cover Phone #: ###-#### >> Inspection requested via web by Sean DeLacy soffits anop
|
Electrical Rough-In | 6/16/2011 | 6/17/2011 | 6/17/2011 | P | PASS |
Bob Reichert
|
|
|
Jason Soffits B3 L3 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok anop
|
Electrical Rough-In | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Woodward ri ok anop
|
Electrical Rough-In | 6/14/2011 | 6/15/2011 | 6/15/2011 | P | NH |
Bob Reichert
|
|
|
Jason Phone #: ###-#### called several times, no answer, left messages
|
Electrical Rough-In | 6/13/2011 | 6/14/2011 | 6/14/2011 | P | CANC |
Bob Reichert
|
|
|
jason Phone #: ###-#### contractor called, not ready, will call for later
|
Electrical Rough-In | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | PASS |
Bob Reichert
|
|
|
Jason ###-#### ri anop ok
|
Electrical Rough-In | 6/6/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Bob Reichert
|
|
|
Jason Phone #: ###-#### ri ok anop
|
Electrical Rough-In | 6/3/2011 | 6/6/2011 | 6/6/2011 | A | NR |
Bob Reichert
|
|
|
jason - first floor conference rooms Phone #: ###-#### called in before electrician ready
|
Electrical Rough-In | 6/1/2011 | 6/3/2011 | 6/3/2011 | A | PASS |
Bob Reichert
|
|
|
jason Phone #: ###-#### areas anop ri ok
|
Electrical Rough-In | 5/19/2011 | 5/20/2011 | 5/20/2011 | P | PASS |
Bob Reichert
|
|
|
Jason B2 L3 Unit 301, 302 & 305 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri anop ok
|
Final | 5/19/2011 | 5/20/2011 | 5/19/2011 | P | CANC |
Bob Reichert
|
|
|
Jason B2 L3 Units 301, 302 & 305 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Electrical Rough-In | 5/16/2011 | 5/16/2011 | 5/16/2011 | P | PASS |
Bob Reichert
|
|
|
B2 L4 D2 & A2 units Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri 4th floor anop
|
Electrical Rough-In | 5/11/2011 | 5/12/2011 | 5/12/2011 | A | PASS |
Bob Reichert
|
|
|
B2 4th floor condo''s Phone #: ###-#### >> Inspection requested via web by Tyler Bowen ri ok anop
|
Electrical Rough-In | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Bob Reichert
|
|
|
Jason B3 L4 F unit & B3 L2 Corridor Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri ok anop, 4th floor, 401, 2nd corridor
|
Electrical Rough-In | 4/29/2011 | 5/2/2011 | 5/2/2011 | A | PASS |
Bob Reichert
|
|
|
JASON B3 L2 UNIT C2 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri ok anop
|
Conference | 4/27/2011 | 4/28/2011 | 4/28/2011 | P | DONE |
Bob Reichert
|
|
|
Dave. BUILDING 2&3 CORRIDORS MEETING. CALL PRIOR TO HEADING TO SITE FOR MEETING. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy talked about mc cable common areas, will check with 414, arc fault receptacles
|
Electrical Rough-In | 4/26/2011 | 4/27/2011 | 4/27/2011 | P | PASS |
Bob Reichert
|
|
|
Jason B3 2nd floor R/I Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ri ok anop, left correction notice re-iterating conference of 12-03-08 stating BCC- elevator and waiting areas are considered public areas, then mc type cable is required, residential hallways ok for nm cable
|
Electrical Rough-In | 4/16/2011 | 4/18/2011 | 4/18/2011 | A | PASS |
Bob Reichert
|
|
|
Jason. D-East, D-West & D.1 Phone #: ###-#### >> Inspection requested via web by Sean DeLacy walls and ceiling anop ok cover
|
Electrical Rough-In | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | CANC |
Bob Reichert
|
|
|
Jason. R/I D-East Phone #: ###-#### >> Inspection requested via web by Sean DeLacy see conf
|
Conference | 4/15/2011 | 4/15/2011 | 4/15/2011 | A | DONE |
Bob Reichert
|
|
|
Jason. R/I D-East Phone #: ###-#### >> Inspection requested via web by Sean DeLacy met contractor, reviewed remodel requirements such as outlet spacing, etc
|
ELE-Aging Inspection | 3/28/2011 | 3/28/2011 | 3/28/2011 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Final | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PASS |
Bob Reichert
|
|
|
JASON BLDG 3 L1 UNITS D EAST, D WEST & D.1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 3 units only ok to final, no card signed, will need new permit for further construction activity
|
Final | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | CANC |
Bob Reichert
|
|
|
JASON BLDG 3 L1 UNITS D EAST, D WEST & D1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called electrician for security code, found doors locked, could not find any people, called contractor to re-schedule
|
Electrical Rough-In | 6/9/2009 | 6/10/2009 | 6/10/2009 | A | PART |
Jack Frank
|
|
|
JASON CEILING COVER BLD 3 L1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok
|
Electrical Rough-In | 3/26/2009 | 3/27/2009 | 3/27/2009 | A | PASS |
Bob Reichert
|
|
|
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ri ok, see p/s- for pump service change from o/h to u/g
|
Permanent Service | 3/27/2009 | 3/27/2009 | 3/27/2009 | A | PASS |
Bob Reichert
|
|
|
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy p/s u/g new ok- pump service from o/h to u/g
|
Electrical Rough-In | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | PASS |
Jack Frank
|
|
|
jason Phone #: ###-#### floor heat 1 bath rm bld#3, unit 101
|
Electrical Rough-In | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Bob Reichert
|
|
|
JASON FLOOR HEAT COVER Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to cover floor heat anop, marked print for last unit also
|
Electrical Rough-In | 2/16/2009 | 2/17/2009 | 2/17/2009 | A | PASS |
Bob Reichert
|
|
|
BLD 3 L1 UNIT 103 D WEST BATHROOM FLOOR HEAT Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called contractor- soffit lights by pool ok to cover, floor heat this unit only ok to cover, could not mark prints this trip
|
Electrical Rough-In | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | PART |
Bob Reichert
|
|
|
JASON CEILING COVER Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to cover entry and corridor hard lids only anop
|
Permanent Service | 12/11/2008 | 12/11/2008 | 12/11/2008 | P | PASS |
Bob Reichert
|
|
|
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy p/s u/g n ok
|
Electrical Rough-In | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | PASS |
Bob Reichert
|
|
|
JASON BLD 3 L1 COMMON AREA Phone #: ###-#### Internet Inspection Request from: Sean DeLacy walls only, anop-common area
|
Electrical Rough-In | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | CANC |
Bob Reichert
|
|
|
JASON BLD3 L1 COMMON AREA Phone #: ###-#### Internet Inspection Request from: Sean DeLacy see conference
|
Conference | 12/3/2008 | 12/3/2008 | 12/3/2008 | A | DONE |
Bob Reichert
|
|
|
JASON BLD3 L1 COMMON AREA Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met electrician, discussion and layout of area for public usage such as elevator and waiting areas are for public, then mc cable is required. Corridors are suitable for nm type cable due to fact that residents are primary people using area and not likely to congreate in large numbers, or time. This goes hand-in-hand with recreational type areas or guest type rooms.
|
Electrical Rough-In | 12/1/2008 | 12/2/2008 | 12/2/2008 | A | PASS |
Bob Reichert
|
|
|
JASON CEILING COVER B3 L1 UNITS B1, D, D1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to cover ceilings only anop- 3 umits
|
Electrical Rough-In | 11/26/2008 | 12/1/2008 | 12/1/2008 | A | NH |
Bob Reichert
|
|
|
JASON BLD 3 L1 UNITS D EAST, D WEST & B1 CEILING COVER Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called, left message, called office, not on site, told they need to reschedule when ready, fee due
|
Final | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | CANC |
Jim Schmer
|
|
|
JASON BLD 3 L1 UNITS D EAST, D WEST & D1 CEILING COVER Phone #: ###-#### Internet Inspection Request from: Sean DeLacy reschedualed for monday am jms
|
Permanent Service | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | NR |
Pat Lass
|
|
|
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy had conf. everything still has to be rechecked.
|
Electrical Rough-In | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | PASS |
Bob Reichert
|
|
|
JASON BLDG 2 L4 UNITS D2, A2, C2, E1 & E2 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ric ok rooms, building 2, 3rd floor, anop
|
Electrical Rough-In | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | CANC |
Bob Reichert
|
|
|
JASON. BUILDLINGS 2 & 3 L1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy see conference
|
Conference | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | DONE |
Bob Reichert
|
|
|
JASON. BUILDLINGS 2 & 3 L1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met electrician, talked about decisions for common areas to be wired in raceways per 324, and structural call about corridors using nm cable or raceways.
|
Electrical Rough-In | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | CANC |
Mike Kinnear
|
|
|
JASON BLDG 2 & 3 L1 COMMON AREAS Phone #: ###-#### Internet Inspection Request from: Sean DeLacy wrong type inspection look at conf.
|
Conference | 10/21/2008 | 10/21/2008 | 10/21/2008 | A | DONE |
Mike Kinnear
|
|
|
JASON BLDG 2 & 3 L1 COMMON AREAS Phone #: ###-#### Internet Inspection Request from: Sean DeLacy conf regarding hallways & lobies fire rating no romex in those areas? per fire code
|
Electrical Rough-In | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
Bob Reichert
|
|
|
JASON BLDG 3 L2 UNIT D - EAST & D - WEST. Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 2 units, ric ok, anop
|
Electrical Rough-In | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Bob Reichert
|
|
|
JASON BLD 3 L2 UNITS C, A2, C2, D1 & B1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to cover 5 units 2nd floor anop
|
Electrical Rough-In | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PASS |
Bob Reichert
|
|
|
JASON BLD 3 LEVEL 3 UNITS A2, C, C2, E1 & E2 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok to cover 3rd floor anop
|
Electrical Rough-In | 9/23/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Bob Reichert
|
|
|
JASON BLDG 3 L4 UNITS C2 & E1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ric 2 units 4th floor anop
|
Electrical Rough-In | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | PASS |
Bob Reichert
|
|
|
JASON BUILDING 3 L4 UNITS F & E2 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ric ok 2 units 4th floor anop and log
|
Electrical Rough-In | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Bob Reichert
|
|
|
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 1st floor north 4 units anop ok to cover
|
Electrical Rough-In | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | CANC |
Bob Reichert
|
|
|
JASON L1 BLDG 2 UNITS D EAST, D WEST, B1, D1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy see conference
|
Conference | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | DONE |
Bob Reichert
|
|
|
JASON L1 BLDG 2 UNITS D EAST, D WEST, B1, D1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met electricians, talked about and reviewed 1 unit, told that receptacle spacing shall be met, reviewed 1 1/4", looked at service areas, told to show listing for assemblies for meters, reviewed plans, reviewed requirement to follow 2008 NEC, will need separate permits for each meter
|
Conference | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | DONE |
Bob Reichert
|
|
|
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy talked about ceing area as common space between upper and lower unit. Also drip protection required above dedicated space.Told electrician to set boxes for outside lights before ri.
|