Rough-In Permanent Service | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | CANC |
Bob Reichert
|
|
|
#90746,Q#8231AVP. ADDED 1 NEW DUPLEX RECEPTACLE TO THE EXISTING ONES INSIDE THE EXISTING PHONE CABINET. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell see ri and final, wrong type request, no esc this project
|
Final | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Bob Reichert
|
|
|
#90746,Q#8231AVP. ADDED 1 NEW DUPLEX RECEPTACLE TO THE EXISTING ONES INSIDE THE EXISTING PHONE CABINET. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final, no esc this project
|
Electrical Rough-In | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Bob Reichert
|
|
|
#90746,Q#8231AVP. ADDED 1 NEW DUPLEX RECEPTACLE TO THE EXISTING ONES INSIDE THE EXISTING PHONE CABINET. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ri ok, no esc this project
|