Final | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/10/2008 at 8:36:53 AM. Contact: ###-####. called contractor, ok to final
|
Rough-In Permanent Service | 9/12/2008 | 9/15/2008 | 9/15/2008 | A | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### ric ok both sides, p/s o/h n ok (2 meters)
|