Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Mike Kinnear
|
|
|
ready for final Phone #: ###-#### Internet Inspection Request from: gary batten ok final note no esc permit in project
|
Electrical Rough-In | 10/16/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Pat Lass
|
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten R/I Ok check service to garage on final for isolation of neutral retainer on backfed breaker 250.148 in J-box under panel and removal of GEC from raceway. I allowed rail in working space because it was only a couple of inches and this was the same location as original service.
|