Final | 12/2/2009 | 12/3/2009 | 12/3/2009 | A | PASS |
Bob Reichert
|
|
|
Requesting an inspection of the dental office area for final. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ul verified x-ray machines ok, ok to final, signed occupancy card
|
Final | 10/23/2009 | 10/26/2009 | 10/26/2009 | A | PART |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to final all but x-ray machines, see correction notice, signed t/o card
|
Electrical Rough-In | 10/23/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Bob Reichert
|
|
|
Requestig a inspection of the Dentist office. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover ceilings only, left correction notice for x-ray machines, BCC 4-05-033(A),(B) all equipment shall be listed by a nationally recognized testing laboratory, NEC 110.3 all equipment shall be approved
|
Electrical Rough-In | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PASS |
Bob Reichert
|
|
|
Requesting a re inspection of the dental office. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty walls only ok to cover
|
Electrical Rough-In | 9/28/2009 | 9/29/2009 | 9/29/2009 | P | CANC |
Bob Reichert
|
|
|
Requesting an inspection of the Dental office. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty see conference
|
Conference | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | DONE |
Bob Reichert
|
|
|
Requesting an inspection of the Dental office. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty met electrican, reviewed patient care areas and the requirement for redundant grounding, not using fmc for redundant grounding, can't add esc inspection
|
Conference | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | CANC |
Bob Reichert
|
|
|
Requesting a undergound conduit inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty wrong type request, see ri
|
Electrical Rough-In | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PASS |
Bob Reichert
|
|
|
Requesting a undergound conduit inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty contractor opened u/g , ok to cover u/g to 6 lights
|
Electrical Rough-In | 8/31/2009 | 8/31/2009 | 8/31/2009 | P | PART |
Bob Reichert
|
|
|
Requesting inspection of 6 pole bases. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to pour pole bases only, contractor to uncover u/g to inspect for conduit bends, backfill material, conduit depth, spacing
|
Final | 8/11/2009 | 8/12/2009 | 8/12/2009 | A | PART |
Bob Reichert
|
|
|
Requesting a late morning final inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to part final, signed t/o card, left correction notice- dental area shall not be placed into service, will resolve and call for final later
|
Final | 8/10/2009 | 8/11/2009 | 8/11/2009 | A | PART |
Bob Reichert
|
|
|
Requesting a final inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty looked at mezzanine, rooftop, and outside, anop, need to see pump house before t/o, told contractor will check with 315
|
Final | 8/10/2009 | 8/10/2009 | 8/10/2009 | A | PART |
Jack Frank
|
|
|
Requesting a final inspection. Phone #: ###-#### Internet Inspection Request from: Dan area B anop
|
Final | 8/7/2009 | 8/7/2009 | 8/7/2009 | P | PART |
Jack Frank
|
|
|
Requesting a partial final inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty t/o for d wing anop
|
Final | 8/6/2009 | 8/7/2009 | 8/7/2009 | A | PART |
Jack Frank
|
|
|
Requesting a partial final inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty A wing and administration area ok anop for T/O
|
Electrical Rough-In | 8/6/2009 | 8/7/2009 | 8/7/2009 | A | NR |
Jack Frank
|
|
|
Requesting a ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty note art 225, for more than one service to outbuilding, and 250.32 electrode for bld
|
Electrical Rough-In | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | CANC |
Jack Frank
|
|
|
Requesting a partial final inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty wanted partial final check two areas not ready needs power on and all recepts working
|
Electrical Rough-In | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | PART |
Bob Reichert
|
|
|
Requesting a partial ceiling inspection to cover. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ceilings ok to cover music room and south c wing except dental area anop
|
Electrical Rough-In | 7/24/2009 | 7/27/2009 | 7/27/2009 | A | PART |
Bob Reichert
|
|
|
Requesting a ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover ceilings sw part "D" wing anop
|
Electrical Rough-In | 7/16/2009 | 7/16/2009 | 7/16/2009 | A | PASS |
Bob Reichert
|
|
|
Requesting a soffit inspection for the East and South entry. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty east and south soffits ok to cover
|
Electrical Rough-In | 7/13/2009 | 7/13/2009 | 7/13/2009 | P | PART |
Bob Reichert
|
|
|
Requesting a soffit inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover soffits anop
|
Electrical Rough-In | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PART |
Doug A Poedy
|
|
|
Requesting an inspection of A wing ceiling to close for cover. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty. Ok to cover south A area and related corridors ceilings.
|
Electrical Rough-In | 7/1/2009 | 7/1/2009 | 7/1/2009 | P | PART |
Jack Frank
|
|
|
Requesting a ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok anop
|
Electrical Rough-In | 6/24/2009 | 6/24/2009 | 6/25/2009 | P | PART |
Jack Frank
|
|
|
Requesting an inspection to close for cover C wing administration ceiling, and reinspection of D wing ceiling. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok anop
|
Electrical Rough-In | 6/16/2009 | 6/16/2009 | 6/16/2009 | P | FAIL |
Jack Frank
|
|
|
Requesting a ceiling inspection to cover for D wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty corr called needs support wires for cables and boxes
|
Electrical Rough-In | 6/8/2009 | 6/9/2009 | 6/9/2009 | A | PART |
Bob Reichert
|
|
|
Requesting a partial ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover ceilings anop
|
Conference | 6/5/2009 | 6/8/2009 | 6/8/2009 | A | DONE |
Jack Frank
|
|
|
Requesting a consultation. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty conf. on wiremold
|
Electrical Rough-In | 5/27/2009 | 5/27/2009 | 5/27/2009 | P | PASS |
Jack Frank
|
|
|
Requesting an interior wall inspection for the dentist office and C wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok anop
|
Electrical Rough-In | 5/20/2009 | 5/20/2009 | 5/21/2009 | P | PART |
Jack Frank
|
|
|
Requesting an inspection of the interior walls in B wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok anop
|
Electrical Rough-In | 5/7/2009 | 5/7/2009 | 5/7/2009 | P | PART |
Bob Reichert
|
|
|
Requesting a rough in inspection of B wing exterior walls. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty walls and ceilings ok to cover anop
|
Electrical Rough-In | 4/30/2009 | 4/30/2009 | 4/30/2009 | P | PART |
Bob Reichert
|
|
|
Requesting an inspection of the high ceiling in B wing and a service inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover high ceiling anop only
|
Permanent Service | 4/30/2009 | 4/30/2009 | 4/30/2009 | P | PASS |
Bob Reichert
|
|
|
Requesting an inspection of the high ceiling in B wing and a service inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty p/s u/g n ok, sticker is on main service gear
|
Electrical Rough-In | 4/23/2009 | 4/23/2009 | 4/23/2009 | P | PART |
Jack Frank
|
|
|
Requesting a wall inspection for the Library and the end of A wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok anop
|
Conference | 4/14/2009 | 4/14/2009 | 4/14/2009 | A | DONE |
Bob Reichert
|
|
|
talked about solar array installation for school
|
Electrical Rough-In | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Bob Reichert
|
|
|
Requesting a wall inspection for C wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty c wing walls only ok to cover anop
|
Electrical Rough-In | 4/8/2009 | 4/8/2009 | 4/8/2009 | P | PART |
Mike Kinnear
|
|
|
Requesting a wall inspection for A wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok cover walls anop
|
Electrical Rough-In | 3/31/2009 | 3/31/2009 | 3/31/2009 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/31/2009 at 6:34:56 AM. Contact: ###-####. walls only ok to cover anop
|
Electrical Rough-In | 3/24/2009 | 3/24/2009 | 3/24/2009 | P | PART |
Bob Reichert
|
|
|
Requesting a high ceiling inspection of the Library and the end of A wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover library and part of A wing high ceilings anop
|
Electrical Rough-In | 3/18/2009 | 3/19/2009 | 3/19/2009 | A | PART |
Mike Kinnear
|
|
|
Requesting an exterior wall inspection for C wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok cover ext walls only anop
|
Electrical Rough-In | 3/16/2009 | 3/16/2009 | 3/16/2009 | A | PART |
Mike Kinnear
|
|
|
Requesting an inspection of C wing corridor and above the 12'' deck ceiling. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok cover hard lid fire ceiling anop
|
Electrical Rough-In | 3/10/2009 | 3/11/2009 | 3/11/2009 | A | PASS |
Mike Kinnear
|
|
|
Requesting a rough in inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok cover walls & hard lid ceilings anop
|
Electrical Rough-In | 2/27/2009 | 3/2/2009 | 3/2/2009 | A | PASS |
Bob Reichert
|
|
|
Requesting a wall inspection for A wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty corrections made, ok to cover walls only area A, anop
|
Electrical Rough-In | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | FAIL |
Bob Reichert
|
|
|
Requesting a wall inspection for A wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty met contractor, gave correction notice, NEC 358..26 there shall not be more than 360 degrees bend in raceway , 358.30(A) emt shall be securely fastened within 3' of every termination, BCC all boxes shall be completed with conduit run to them, will call for re-inspection next week early
|
Electrical Rough-In | 2/16/2009 | 2/17/2009 | 2/17/2009 | A | PASS |
Bob Reichert
|
|
|
Requesting a ceiling inspection for D-wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover D wing hard lids only anop
|
Electrical Rough-In | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | PART |
Bob Reichert
|
|
|
Requesting a firewall inspection in "A" wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty met general and electrical contractor, ok to provide 1 side for firewall and part hall- top 1/2 cover only
|
Electrical Rough-In | 1/30/2009 | 2/2/2009 | 2/2/2009 | A | PART |
Bob Reichert
|
|
|
Requesting a ceiling inspection only for A-wing. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover under deck only anop
|
Electrical Rough-In | 11/12/2008 | 11/13/2008 | 11/13/2008 | P | PART |
Bob Reichert
|
|
|
Requesting an early afternoon underground inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover u/g anop for computer desks and dental area ( power in rigid conduit )
|
Electrical Rough-In | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | PART |
Mike Kinnear
|
|
|
Requesting an inspection of slab work. Our man Scott will be there. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok cover under ground conduit & boxes anop
|
Electrical Rough-In | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PART |
Bob Reichert
|
|
|
Requesting a partial underground inspection of the parking lot. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty u/g anop ok to cover- west and north parts of building
|
Electrical Rough-In | 10/8/2008 | 10/9/2008 | 10/9/2008 | A | PART |
Bob Reichert
|
|
|
Requesting a partial underground inspection of the parking lot. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty east and south u/g anop ok to cover
|
Electrical Rough-In | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PART |
Bob Reichert
|
|
|
Requesting a partial underground and light pole bases inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover lv, power, communications interior under building for area C
|
Electrical Rough-In | 9/23/2008 | 9/24/2008 | 9/24/2008 | A | PART |
Bob Reichert
|
|
|
Requesting a partial underground inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover stem walls east of transformer, ok to cover u/g duct north of transformer to elect room about 120 feet north, looked at block-outs east stem walls
|
Electrical Rough-In | 9/15/2008 | 9/16/2008 | 9/16/2008 | A | PART |
Mike Kinnear
|
|
|
Requesting a UFER and partial underground inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok cover ufer ground part duct bank to transformer
|